Geothermal Module Guide

Geothermal Heat Pump Design & Modeling Guide

What geothermal modeling software has to get right, and how CogenS does it: one model that sizes the borefield, picks the plant around it, reads the heat pump at the real loop temperature, and prices the whole thing over the life of the project.

What Geothermal Modeling Software Has to Answer

Good geothermal modeling software has to answer a question about a decade you have not reached yet. A borefield is drilled once, into ground nobody can inspect, and it stays there for the life of the building. Every other piece of equipment can be resized later. The ground loop cannot.

The ground works on two time scales. Over an hour it is a poor heat exchanger: each borehole moves only tens of watts per metre, which is why fields are long. Over a decade it is a huge thermal store that remembers every kilowatt-hour you took out or put in. A field can meet its peak duty for four years and then slowly drift out of range. By the time that shows up, the holes are already in the ground.

The heat pump makes it harder. An air-source heat pump faces the weather, which it cannot change. A ground-source (GSHP) machine faces a loop whose temperature is the running total of everything it has already done. Its efficiency this winter depends on how hard it worked last summer. So capacity, efficiency and even whether the machine may run at all depend on a loop temperature that has to be simulated, not assumed.

Then comes the money. The field size, the heat pump, the backup plant, the tariff and the yearly balance between heat taken from the ground and heat put back all decide whether the project pays back. A sound geothermal techno-economic analysis (TEA) has to treat them as one problem.

How CogenS Models a Ground-Source Heat Pump Plant

The borefield.CogenS models vertical closed-loop fields with GHEtool, an open-source ground-loop engine whose authors validated it against an established commercial design tool in a peer-reviewed paper. It is used unmodified. The model works out the borehole's thermal resistance from the hole size, U-tube layout, pipe, grout and fluid you enter, includes the interference between neighbouring boreholes, and rolls the ground forward year by year across your study period. Every field is checked against the minimum and maximum loop fluid temperatures you set.

The heat pump.Pick a water-source heat pump from the catalogue or enter your own. In the full model, capacity and efficiency (COP) come from the machine's performance curves at each step's loop temperature, with a penalty for cycling at part load. When the loop goes outside your temperature limits, the heat pump stops for that step and the rest of the plant picks up the load. The plant can be a reversible single-circuit machine or a four-pipe plant with two circuits, which changes how much simultaneous heating and cooling can cancel in the ground.

Hybrid balancing. The yearly imbalance between heat put into the ground and heat taken out decides whether a field stays in range. CogenS lets you add the levers that move it: a CHP or boiler for heating, an absorption or electric chiller for cooling, a hybrid loop (cooling tower or dry cooler) to reject surplus heat, storing surplus CHP heat in the ground, and a ground-loop heat pump for domestic hot water. Battery storage and solar can sit on the electric side.

The economics.System Optimization compares up to five equipment combinations over a full year against your utility tariff, including a wet tower's make-up water and any carbon price you set, and recommends the lowest-cost plant within your ground balance target. The full model then replays that plan through the field and equipment you specified, prices it, and builds a TEA report with NPV, IRR, payback, total cost of ownership and a sensitivity analysis.

How CogenS Does Ground Loop Design Differently

A common workflow splits the job in two. The loop field is sized in a standalone ground loop design tool from peak and monthly loads, and the economics are built separately in a spreadsheet. The two rarely talk to each other, so the field, the backup plant and the tariff are never traded off against one another.

One model, one plan. In CogenS the optimizer chooses the plant mix and the ground loop together, on the real tariff, and the full model tests that same plan. The report describes the plant the optimizer recommended, and shows in numbers where it fell short once the ground and the heat pump are real: heating and cooling shortfall against the plan, and the share of the planned ground load the field carried.

Balance is a design input. You set how far the ground may end each year out of balance, as a share of the heat moving through it. The optimizer charges any miss so heavily that a balanced design always ranks first, and tells you plainly when no combination can keep the reservoir in balance.

Design for the land you have. Leave the borehole count and depth blank and the model proposes the fewest holes that fit under a practical depth cap, as a recommendation it never types in for you. Enter the field your site can hold and the model measures what that field can carry, designs the plant around it, and shows the no-land-limit field beside it for comparison. It also tests single changes to your field (deeper holes, more holes, wider spacing, double U-tubes, larger pipes, enhanced grout) and reports the capacity each one adds.

Honest answers. If more than 2% of the heating or cooling load goes unserved, the report withholds NPV, IRR and payback rather than show a false return. And if the lowest-cost plant uses no ground loop at all, CogenS says so instead of proposing a token field.

Geothermal Module at a Glance

Ground Loop

Vertical closed-loop borefields modeled with the published GHEtool engine: borehole resistance from your geometry and materials, borehole interference, and year-by-year ground drift over a study period of up to 50 years.

Borefield Sizing

Leave count and depth blank for a recommended field, or enter your own field to see what it can carry, which temperature limit binds, and what each single geometry change would add.

Ground Properties

Pick a ground type to fill conductivity and heat capacity, then replace them with thermal-response test values when you have them. Set the undisturbed ground temperature and the fluid temperature limits.

Heat Pump

Catalogue or custom water-source heat pumps, read at each step's loop temperature with part-load cycling losses. Reversible single-circuit or four-pipe plant topology.

Hybrid Balancing

CHP, boiler, absorption or electric chiller, cooling tower or dry cooler, storing surplus CHP heat in the ground, and ground-loop hot-water heating, plus battery storage and solar PV.

Optimization

Compares up to five equipment combinations over a full year against your tariff, with a reservoir balance target, tower make-up water and any carbon price included in the comparison.

Time Step

15, 20, 30 or 60 minute projects. The ground model works in hours; the heat pump, plant and bills run at your project's own time step.

Output

TEA report with NPV, IRR, payback, TCO, seasonal COP, loop temperatures and drift, dispatch plots and a sensitivity analysis, plus a per-time-step CSV and an Excel financial model.

How to Design a Geothermal Project in CogenS

The page-by-page flow the Geothermal module walks you through, from the landing card to the report.

  1. Choose the equipment around the heat pump

    On the Geothermal card, tick the equipment that works alongside the ground loop and heat pump: CHP, boiler, an absorption or electric chiller, a hybrid loop, battery storage, solar PV and domestic hot water. Each choice adds its own specification page.

  2. Set up the site

    On Site Information, set the location, the time step and the study period, and load the heating and cooling profiles (plus electric and hot-water profiles when you use them). The study period is how many years the ground is rolled forward.

  3. Enter the utility rates

    The base case is the site buying everything from the grid and its fuel suppliers. With CHP, battery or solar in the plant, the new plant is billed on its own DER rates. A water tariff prices a wet tower's make-up water.

  4. Run System Optimization

    Set the reservoir balance target, check up to five equipment combinations and run. You get the ground loop assessment (imbalance before and after design), the recommended system, the borefield, the dispatch plots and a before-tax financial summary.

  5. Specify the ground loop and heat pump

    On the Ground Loop page, set the soil, grout, pipe, fluid, temperature limits and loop pump. Type in the borehole count and depth you will actually drill. On the Water-Source Heat Pump page, pick the machine and its topology. Fill in the supplementary equipment pages.

  6. Set the financial parameters

    The default cost prices the ground loop per metre of drilled bore and the heat pump per kW, from the cost catalogue, in your project currency. Any number you type is kept as typed.

  7. Run the full model

    Model Execution replays the optimizer's plan through the field you entered, simulates the ground over the whole study period, and reads the heat pump at the loop temperature of the most drifted year. If a setting the plan depends on has changed, it asks you to re-run System Optimization first.

  8. Read the TEA report

    Check seasonal COP, loop temperatures and drift, the share of the planned ground load the field carried, and the heating and cooling shortfall against the plan. Then review NPV, IRR, payback and TCO, and use the sensitivity analysis to see which input moves the result most.

Ready to run a real analysis?

Sign up free and run a complete technoeconomic analysis in your browser — pre-loaded weather, tariffs, equipment specs, and financials for 340+ cities.