Pathfinder Module Guide
District Energy Technoeconomic Modeling for Heating & Cooling Central Plants
How to pick the right central plant for a campus or district: size it to the load the buildings actually make together, count the heat the pipes lose, and compare complete plants over their whole life. This is how the CogenS™ Pathfinder District Energy Optimizer works.
Why District Plant Selection Is Hard
Good district energy technoeconomic modeling software has to answer one question: which central plant serves every building on the campus at the lowest cost over its life? A district plant makes heat, cooling and hot water in one place and sends it to many buildings through buried pipes. That makes the choice harder than for a single building.
First, the buildings do not all peak at the same hour. An office, a dorm and a lab each peak at different times, so the campus peak is smaller than the sum of the building peaks. Size the plant to that sum and you buy equipment that never runs. The ratio between the two is called the diversity factor.
Second, the pipes lose heat to the ground all year. That loss does not follow the buildings: it is there on a mild summer night as much as on the coldest morning. It sets a minimum load the plant never escapes, which changes how boilers, cogeneration and storage behave.
Third, the technologies depend on each other. A cogeneration (CHP) unit is sized for electricity and gives off heat as a byproduct. An absorption chiller needs a heat source. Comparing one machine against another on its own gives a wrong answer. The fair comparison is between complete plants that each serve the same loads.
Finally, a district plant is often a business. It sells heat and cooling to its customers on a rate card, or it is built and run by a provider under an Energy-as-a-Service (EaaS) contract. The model has to price that too.
How CogenS District Energy Modeling Software Picks a Plant
Campus loads. You add each building group: its type, its size and how many there are. CogenS™ builds an hourly profile for each group from its building-type database for your location, or from your own uploaded profile. You choose which loads the plant serves: heating, cooling and hot water by default, with electricity as an option.
One combined load. The building profiles are added hour by hour, for all 8,760 hours of the year, into one coincident load per load type. The diversity factor is reported, so you can see how much smaller the campus peak is than the sum of the building peaks.
Network losses.For each building group you can enter its pipe route length and its heat loss per metre. CogenS adds that loss as a steady load all year, shares it between the thermal loads in proportion to their annual demand, and sizes every plant on the buildings' demand plus that loss. Electricity carries no pipe loss.
Each technology alone, then all together.In the first pass, each technology you selected (boilers, heat pumps, chillers, cogeneration, gensets, water heaters, solar) is sized to its load and run alone through the same full simulation a standalone CogenS project uses, with its part-load curves, pumps and auxiliaries. In the second pass, one optimization looks at every selected technology at once, including batteries and thermal storage, and chooses both the sizes and the hour-by-hour dispatch that cost the least. Each machine's own model then runs on that plan.
Sized to the combined load. You never type a plant size. The run sizes every machine to the campus load it serves, plus a sizing margin you control, and fills in performance from the closest catalog model.
Complete plants, one verdict. CogenS compares whole plants that each serve every load, including an all-electric plant when your selection allows one. A plant that leaves any load unserved is ruled out. The most expensive working plant becomes the base case, and the recommended plant is the one with the strongest investment case against it. Total cost of ownership breaks a tie. Figures are before tax, on an hourly basis, over the study period you set.
Rate cards and deal structures.If the plant sells heat and cooling, you set a rate card for each customer class: connection, capacity, energy and fixed charges. Five common district deal shapes (municipal cost recovery, regulated utility, concession, campus concession and heat-as-a-service) give a new class its starting shape. You can also model the plant under an Energy-as-a-Service contract (power purchase agreement, concession, capacity tolling or shared savings), with the charge solved for the provider's target return.
The report. One report for the district: the verdict, a decision tree that explains it, the recommended system with its diagram and dispatch charts, energy flows, a sensitivity analysis, every complete plant compared side by side, and a full data export.
How This Differs From the Usual Approach
Usual approach: size each building, then add them up. Many studies size the plant to the sum of building peaks, or to a single assumed diversity factor. CogenS adds the hourly profiles first and sizes to the peak of the combined curve, so the diversity comes from your buildings, not from a rule of thumb.
Usual approach: fold the pipe loss into the building loads. A percentage on top of demand puts too much loss on the winter peak and almost none in summer. CogenS treats the loss as the steady load it is, which is what keeps a cogeneration unit or a boiler running in summer.
Usual approach: compare machines one at a time. Setting a CHP unit against a boiler prices a power plant as if it were a heater. CogenS always compares complete plants: a CHP is bundled with its backup boiler and any chiller its heat drives, and set against equally complete alternatives.
Usual approach: a handful of options in a spreadsheet.Hand-built comparisons usually test three or four plant layouts with fixed sizes and flat efficiencies. CogenS runs every selected technology through a full hourly simulation, then lets an optimizer search sizes and dispatch across the whole mix, and checks the result again with each machine's own model.
Usual approach: cheapest first cost wins. A plant that sells power or stores energy spends more up front and earns some of it back. CogenS ranks plants on their investment case over the study period and rules out any plant that cannot carry the load, so a cheap answer that simply stops serving never wins.
District Energy Optimizer at a Glance
Project Scope
One location, many building groups, one central plant. Heating, cooling and hot water by default; electricity optional.
Load Model
Hourly (8,760-hour) profiles per building group, from the building-type database or your own upload, added into one coincident load with the diversity factor reported.
Distribution Network
Pipe route length and heat loss per metre for each building group, added as a steady loss all year and shared across the thermal loads.
Technologies
Gas, electric and heat pump boilers; air-cooled, water-cooled and absorption chillers; CHP; gensets; water heaters; solar PV; batteries; thermal storage.
Method
Each technology simulated alone (batteries only as part of the mix), then one optimization over the whole mix for sizes and hourly dispatch, then each machine's own model run on that plan.
Verdict
Complete plants compared, unserved load ruled out, the strongest investment case against the most expensive working plant recommended, total cost of ownership as the tie-breaker.
Commercial Model
Heating and cooling rate cards per customer class, five district deal shapes, and Energy-as-a-Service contracts solved for a provider's target return.
Output
District report with verdict, decision tree, system diagram, dispatch charts, energy flows, sensitivity analysis, every plant compared, and a data export.
How to Design a District Plant in CogenS
The page flow of the District Energy Optimizer, from buildings to verdict.
Site Information: add the buildings
Pick the location and study period, choose the loads the plant serves, and add each building group with its type, size and count. Enter each group's pipe route and heat loss per metre if you have them. The combined campus load appears as you go.
Utility Rates: set the tariff
The district bills on one project tariff for electricity and gas, with optional escalation rates. Opening the page fills in the default tariff for your location, which you can replace with your own.
Technology Mix: pick the candidates
One tab per load type. Choose up to three technologies for each load, plus thermal storage on heating and cooling, with their costs, efficiencies and limits. You never type a size: the run sizes every machine.
Financial Parameters: set the economics
Enter the real discount rate and inflation, and any network and other plant costs. Turn on a rate card to sell heat and cooling by customer class, or an Energy-as-a-Service deal if a provider will own the plant.
Model Execution: run it
One press runs both passes, prices the comparison plants and picks the verdict. Progress shows each step by name, and you can leave the page while it runs.
Report: read the verdict
Open the district report to see the recommended plant, why it won, how it runs hour by hour, and how it compares with every other complete plant. Use the sensitivity analysis to see which input matters most.
Related Guides
Thermal Systems TEA Guide
The boilers, chillers, cooling towers and water heaters a district plant is built from, evaluated on shared assumptions.
CHP Technoeconomic Analysis Guide
When cogeneration earns its place in a central plant, and how to size it.
Energy-as-a-Service Deal Structures
How a provider-owned plant is paid for, and how the fee is set to meet a target return.
Ready to run a real analysis?
Sign up free and run a complete technoeconomic analysis in your browser — pre-loaded weather, tariffs, equipment specs, and financials for 340+ cities.